欢迎访问2023澳门正版资料免费网站!

2023澳门正版资料免费

热线电话

15165180688

您现在所在的位置 :首页 - 新闻中心 > 行业资讯

行业资讯

摊铺机出租之后施工中的注意事项

来源:/ 日期:2022-08-19
在摊铺机开始施工之前,应该先做一系列检查,确定大型路面机器设备没有问题方可开始正常作业,那么摊铺机在运行的过程中,我们需要具备怎样的特殊技术要求呢?下面跟着济南摊铺机出租厂家一起来看看出租摊铺机之后施工中的注意事项吧:
Before the construction of the paver, a series of inspections should be carried out to ensure that the large-scale pavement machinery and equipment are free of problems before the normal operation. What special technical requirements do we need to have during the operation of the paver? Let's follow the Jinan paver rental manufacturer to see the precautions in construction after renting the paver:
(1)按照施工的严格要求,合理确定摊铺机出租之后的工作速度、摊铺宽度、摊铺厚度、刮板输送器及螺旋分料器转速、斗门开度等技术参数。
(1) According to the strict requirements of construction, reasonably determine the working speed, paving width, paving thickness, speed of scraper conveyor and spiral distributor, opening of bucket door and other technical parameters of the paver after leasing.
(2)机械在传动的沥青混合料摊铺机机,换档一定须在摊铺机完全停止时进行,并严禁用力挂档。
(2) For the asphalt mixture paver driven by machinery, the gear shift must be carried out when the paver is completely stopped, and it is strictly prohibited to shift with force.
(3)准备卸料时,摊铺机推轮靠近自卸车后轮,自卸车挂空档。摊铺机同时推动两个。
(3) When preparing for unloading, the pushing wheel of the paver shall be close to the rear wheel of the dump truck, and the dump truck shall be in neutral. The paver pushes two at the same time.
济南摊铺机出租
(4)摊铺机的所有部件和系统,必要时应及时协调和校正。运行速度应保持稳定,停车和启动次数应尽量减少,以保持设备的连续和平衡运行。
(4) All components and systems of the paver shall be timely coordinated and corrected when necessary. The operation speed shall be stable, and the number of shutdown and startup shall be minimized to maintain the continuous and balanced operation of the equipment.
(5)严禁操作人员在设备作业时离开驾驶台,无关人员不得在作业时上、下设备,或在驾驶台上停留。
(5) It is strictly prohibited for operators to leave the bridge during equipment operation. Irrelevant personnel are not allowed to get on and off the equipment or stay on the bridge during operation.
(6)摊铺机转场后若是在行驶的过程中,禁止在坡道上换档,或空档下坡滑行。摊铺作业前20-40min,对熨平板进行预热,使其接近沥青混合料的摊铺温度;因故暂停作业时,使用预热系统进行保温,防止熨平板冷却;用电预热时,应先启动发动机。
(6) If the paver is running after transfer, it is prohibited to shift gears on the slope or slide down the slope in neutral. Preheat the screed 20-40min before paving to make it close to the paving temperature of asphalt mixture; When the operation is suspended for some reason, the preheating system shall be used for thermal insulation to prevent the screed from cooling; When preheating with electricity, start the engine first.
此外现在很多工程机械设备都会选择大型正规公司进行租赁,我们在选择摊铺机设备公司的时候,须多方对比,签订相应的租赁合同,主要是了解混凝土摊铺机设备的概况,使用程度,有没有严重的损坏,还有租赁期限,所租赁的收费情况,这些都是要提前了解清楚的。更多事项就来我们网站咨询了解吧!
In addition, many construction machinery and equipment will be leased by large-scale regular companies. When we choose the paver equipment company, we must compare with each other and sign the corresponding lease contract. The main purpose is to understand the general situation of the concrete paver equipment, the degree of use, whether there is serious damage, the lease term, and the rental charges. All these should be understood in advance. For more information, please visit our website Consult and understand!
  • 上一条:挖掘机租赁公司应该注意什么
  • 下一条:好好使用挖掘机就要多了解相关事项
  • 相关产品: